Monday, April 12, 2010

commissioning


1.The engineering design,troubleshooting and commissioning of substation automation system project, which includes protection relays system and SCADA/RTU system. Take charge of comprehensive technical issues,project process and coordination with chi straightener Utility customers.Major performance was twelve projects of substation automation system within Hubei province.2.Designing some auxiliary electronic devices which are related with above chi flat iron automation system,eg, 3-phase breaker operation unit, PT paralleling unit, Transformer tap position indication unit.
Project Description:Solely finished six chi hair straightener projects of substation automation system,the major work was 1.Discuss and confirm design scheme and sign off technical agreement with Electric power design institute; 2.Design device chi flat iron installation schematic and circuit principle diagram; 3.Control the process of the device installation polo shirts and the purchase of devices for software platform; 4.Finish the internal test of protection devices as well as the setup and pre-test of software platform of SCADA system. 5.Cooperate with Utility engineers to finish the field test of chi hair straightenersprotection devices and SCADA system as well as the integration of the products from other chi hair straighteners manufacturers untill the whole system is put into operation successfully.
creature
filmm
Believe in god
Envionment
Moonlight shadow

No comments:

Post a Comment